Baihetan - Jiangsu ±800kV UHVDC transmission project

Bidding products: bridge arm reactor, filter group reactor

Filter group reactor: Yucheng converter station

Year of operation: 2022

        The Baihetan-Jiangsu UHV project was approved by the National Development and Reform Commission in November, with a total investment of about 30 billion yuan, and is scheduled to be completed in 2022。The project started at Baihetan Converter Station in Liangshan Prefecture, Sichuan Province,Stops at Yucheng converter Station in Suzhou, Jiangsu Province,The route is 2,087 km long,It passes through 5 provinces, 19 cities and 59 districts and counties,It is necessary to cross the Minjiang River in Yibin, Sichuan, Jiangjin Yangtze River in Chongqing, Hanjiang River in Zhongxiang, Hubei, and Maanshan Yangtze River in Anhui,The terminal Yucheng converter station will apply the hybrid cascade technology of conventional DC and flexible DC for the first time in the field of DC transmission in the world。The power transmission capacity is 8 million kilowatts, and after completion, it can transmit 31.2 billion kilowatt-hours of electricity to the provincial grid every year。 

cd5e05c3e211fa5fb95ec9b5384abcf0.jpg